Step 1: Define the actual traffic and load requirements
-
Step 2: Check the relevant technical standards before writing the PO
-
Step 3: Get an itemized quote – not just a lump sum
-
Step 4: Calculate the total cost of ownership, not just the purchase price
-
Step 5: Verify certifications and compliance documents
-
Step 6: Confirm lead times and shipping terms
-
Step 7: Plan installation and commissioning resources
-
Watch out for these common mistakes
If you're managing a commercial construction project, you've probably got a stack of specs for thyssenkrupp elevators, stair lifts, structural steel, and building materials. And you're wondering whether you're about to pay too much. I've been there. For the past 6 years, I've tracked every invoice and purchase order in our procurement system – including a $180,000 annual budget for building systems. This checklist is the practical version of an elevator components specification guide. It's what I wish someone had handed me before my first big spec review.
This is for procurement managers, facilities leads, or project managers who need to specify elevator components and steel building materials without overpaying. It's a practical walkthrough – 7 steps – from requirements definition to final installation. Use it as a checklist before you send out an RFQ.
Step 1: Define the actual traffic and load requirements
Elevator specs are often over-built because someone assumed “bigger is safer.” But oversized equipment means higher purchase price, more energy, and steeper maintenance contracts. Before contacting any supplier, calculate your daily traffic, peak hours, and motorized wheelchair access if needed. For stair lifts, measure the staircase angle and landing space. Don't rely on guestimates.
One time, we had a rush RFQ for a 3-story office add-on. I had two hours to decide whether to spec a 2,500 lb elevator vs a 2,000 lb model. In hindsight, I should have pushed back on the timeline. The 2,500 lb model cost $4,200 more upfront and $600 extra in annual maintenance. We didn't need it. (The project was a small admin wing, not a hospital.)
Step 2: Check the relevant technical standards before writing the PO
If you're specifying structural steel, the minimum strength and chemistry aren't optional extras. For building steel, ASTM A992 is the standard for wide-flange shapes, while ASTM A36 covers carbon steel plates and bars. For elevator components, ASME A17.1 (in the U.S.) or EN 81-20 (in Europe) are the safety codes. Make sure your spec references the current edition – and confirm that the supplier's thyssenkrupp model actually meets it. Don't accept “similar to.” If you're ordering pre-painted steel panels for an exterior wall and color match matters across batches, specify a Pantone reference. The industry tolerance for brand-critical color is Delta E < 2 (Pantone Color Matching System). Without that, you can end up with two shades of “steel gray” on the same facade.
Step 3: Get an itemized quote – not just a lump sum
A lump-sum quote hides the details that blow your budget. Ask for an itemized breakdown: elevator car, doors, rails, hoistway, controller, fixtures, installation, testing, and freight. For steel, ask for a line-item price per length or weight, including finish and tolerance.
In 2023, I compared quotes from eight vendors over three months. One vendor quoted a total price that looked 7% higher than another. But the second vendor's quote didn't include the controller or installation. Once I added those – and the $1,200 freight charge – the second vendor was actually 12% more expensive. (Which, honestly, made me question their whole sales process.)
Step 4: Calculate the total cost of ownership, not just the purchase price
That cheaper option often comes back to haunt you. For elevators, compare energy consumption, maintenance intervals, spare part availability, and expected lifespan. For steel, consider corrosion protection and whether the coating meets local environmental conditions. A cheaper galvanized finish might fail after 10 years in a coastal environment, requiring a $25,000 repair.
There's something satisfying about watching a TCO spreadsheet catch a mistake before you sign. After getting burned on hidden fees twice, I built a simple cost calculator for every major purchase. It includes a 10-year horizon. It's saved us roughly $8,400 per year – about 17% of our budget.
Step 5: Verify certifications and compliance documents
Every thyssenkrupp component should have a declaration of conformity or a test certificate. For structural steel, you need mill test certificates that trace the heat number – that's your legal proof the material meets the strength and chemistry specified. Ask for these before you place the order, not after delivery.
When we audited our 2023 spending, we found that 15% of our “budget overruns” came from missing certificates that required rushed testing and late fees. Now our policy requires all compliance docs to be submitted with the bid. And if a supplier makes an environmental claim about “green” steel, ask for the substantiation – per FTC guidelines (ftc.gov), environmental claims must be backed by evidence.
Step 6: Confirm lead times and shipping terms
Global supply chains are still unpredictable. A thyssenkrupp elevator may have a standard lead time of 8–10 weeks, but if you need a special control panel or a non-standard cab finish, add 2–4 weeks. For steel, import lead times can stretch to 12 weeks. Whether you're ordering from a structural steel manufacturer or a distributor, ask about Incoterms – FOB vs CIF changes your customs and freight liability.
I still kick myself for not asking about demurrage fees in 2022. Our steel shipment sat at the port for six extra days because the customs broker wasn't notified. That cost us $3,800 in storage.
Step 7: Plan installation and commissioning resources
Elevator installation isn't just “plug it in.” You need a certified technician, a sequenced crane or hoist, and enough buffer time for unexpected site conditions. Same with structural steel: if your connections are welded, you need certified welders and inspection. If they're bolted, you need pre-identified tension control bolts.
In Q2 2024, we switched vendors for a stair lift installation. The new vendor's quote was $900 lower, but their installation crew had to travel from four hours away. That added $450 in travel costs and two extra days of delay. Fine print strikes again.
Watch out for these common mistakes
Here are the three errors I see most often in purchase orders:
- Over-specifying finish: For steel, you may not need a high-end architectural finish if it's hidden behind drywall. But don't downgrade the structural coating if the building is near salt water.
- Ignoring elevator door widths: Standard 36-inch doors might not meet accessibility requirements in your jurisdiction. Check the local code before finalizing.
- Forgetting after-sales service: A thyssenkrupp stair lift or elevator needs periodic maintenance. Ask about response time, availability of technicians in your area, and whether the warranty requires a specific service contract.
That's the checklist. It's not glamorous, but it works. Every time I skip a step, I end up paying for it one way or another. (Usually in the form of a “small” fee I didn't plan for.)